AI-generated Key Takeaways
- 
          
Campaign duration can be defined using either a date range or a duration in days.
 - 
          
The
date_rangefield uses yyyy-mm-dd format, must be inclusive, and the end date must be less than 1 year in the future with a total duration of less than or equal to 92 days. - 
          
The
duration_in_daysfield is an integer value representing the number of days. - 
          
These two fields,
date_rangeandduration_in_days, cannot be used together. 
The duration of a planned campaign.
| Fields | |
|---|---|
 | 
                
                  
                   Date range of the campaign. Dates are in the yyyy-mm-dd format and inclusive. The end date must be < 1 year in the future and the date range must be <= 92 days long. This field cannot be combined with the duration_in_days field.  | 
              
 | 
                
                   
 The duration value in days. This field cannot be combined with the date_range field.  |