Known Direct Subclasses |
An abstract implementation of a calendar system, used to organize and identify dates.
The main date and time API is built on the ISO calendar system. The chronology operates behind the scenes to represent the general concept of a calendar system.
See Chronology
for more details.
Protected Constructor Summary
AbstractChronology()
Creates an instance.
|
Public Method Summary
int | |
boolean | |
int |
hashCode()
A hash code for this chronology.
|
ChronoLocalDate |
resolveDate(Map<TemporalField, Long> fieldValues, ResolverStyle resolverStyle)
Resolves parsed
ChronoField values into a date during parsing. |
String |
toString()
Outputs this chronology as a
String , using the chronology ID. |
Inherited Method Summary
Protected Constructors
protected AbstractChronology ()
Creates an instance.
Public Methods
public int compareTo (Chronology other)
Compares this chronology to another chronology.
The comparison order first by the chronology ID string, then by any
additional information specific to the subclass.
It is "consistent with equals", as defined by Comparable
.
Parameters
other | the other chronology to compare to, not null |
---|
Returns
- the comparator value, negative if less, positive if greater
public boolean equals (Object obj)
Checks if this chronology is equal to another chronology.
The comparison is based on the entire state of the object.
Parameters
obj | the object to check, null returns false |
---|
Returns
- true if this is equal to the other chronology
public int hashCode ()
A hash code for this chronology.
The hash code should be based on the entire state of the object.
Returns
- a suitable hash code
public ChronoLocalDate resolveDate (Map<TemporalField, Long> fieldValues, ResolverStyle resolverStyle)
Resolves parsed ChronoField
values into a date during parsing.
Most TemporalField
implementations are resolved using the
resolve method on the field. By contrast, the ChronoField
class
defines fields that only have meaning relative to the chronology.
As such, ChronoField
date fields are resolved here in the
context of a specific chronology.
ChronoField
instances are resolved by this method, which may
be overridden in subclasses.
EPOCH_DAY
- If present, this is converted to a date and all other date fields are then cross-checked against the date.PROLEPTIC_MONTH
- If present, then it is split into theYEAR
andMONTH_OF_YEAR
. If the mode is strict or smart then the field is validated.YEAR_OF_ERA
andERA
- If both are present, then they are combined to form aYEAR
. In lenient mode, theYEAR_OF_ERA
range is not validated, in smart and strict mode it is. TheERA
is validated for range in all three modes. If only theYEAR_OF_ERA
is present, and the mode is smart or lenient, then the last available era is assumed. In strict mode, no era is assumed and theYEAR_OF_ERA
is left untouched. If only theERA
is present, then it is left untouched.YEAR
,MONTH_OF_YEAR
andDAY_OF_MONTH
- If all three are present, then they are combined to form a date. In all three modes, theYEAR
is validated. If the mode is smart or strict, then the month and day are validated. If the mode is lenient, then the date is combined in a manner equivalent to creating a date on the first day of the first month in the requested year, then adding the difference in months, then the difference in days. If the mode is smart, and the day-of-month is greater than the maximum for the year-month, then the day-of-month is adjusted to the last day-of-month. If the mode is strict, then the three fields must form a valid date.YEAR
andDAY_OF_YEAR
- If both are present, then they are combined to form a date. In all three modes, theYEAR
is validated. If the mode is lenient, then the date is combined in a manner equivalent to creating a date on the first day of the requested year, then adding the difference in days. If the mode is smart or strict, then the two fields must form a valid date.YEAR
,MONTH_OF_YEAR
,ALIGNED_WEEK_OF_MONTH
andALIGNED_DAY_OF_WEEK_IN_MONTH
- If all four are present, then they are combined to form a date. In all three modes, theYEAR
is validated. If the mode is lenient, then the date is combined in a manner equivalent to creating a date on the first day of the first month in the requested year, then adding the difference in months, then the difference in weeks, then in days. If the mode is smart or strict, then the all four fields are validated to their outer ranges. The date is then combined in a manner equivalent to creating a date on the first day of the requested year and month, then adding the amount in weeks and days to reach their values. If the mode is strict, the date is additionally validated to check that the day and week adjustment did not change the month.YEAR
,MONTH_OF_YEAR
,ALIGNED_WEEK_OF_MONTH
andDAY_OF_WEEK
- If all four are present, then they are combined to form a date. The approach is the same as described above for years, months and weeks inALIGNED_DAY_OF_WEEK_IN_MONTH
. The day-of-week is adjusted as the next or same matching day-of-week once the years, months and weeks have been handled.YEAR
,ALIGNED_WEEK_OF_YEAR
andALIGNED_DAY_OF_WEEK_IN_YEAR
- If all three are present, then they are combined to form a date. In all three modes, theYEAR
is validated. If the mode is lenient, then the date is combined in a manner equivalent to creating a date on the first day of the requested year, then adding the difference in weeks, then in days. If the mode is smart or strict, then the all three fields are validated to their outer ranges. The date is then combined in a manner equivalent to creating a date on the first day of the requested year, then adding the amount in weeks and days to reach their values. If the mode is strict, the date is additionally validated to check that the day and week adjustment did not change the year.YEAR
,ALIGNED_WEEK_OF_YEAR
andDAY_OF_WEEK
- If all three are present, then they are combined to form a date. The approach is the same as described above for years and weeks inALIGNED_DAY_OF_WEEK_IN_YEAR
. The day-of-week is adjusted as the next or same matching day-of-week once the years and weeks have been handled.
The default implementation is suitable for most calendar systems.
If ChronoField.YEAR_OF_ERA
is found without an ChronoField.ERA
then the last era in Chronology.eras()
is used.
The implementation assumes a 7 day week, that the first day-of-month
has the value 1, that first day-of-year has the value 1, and that the
first of the month and year always exists.
Parameters
fieldValues | the map of fields to values, which can be updated, not null |
---|---|
resolverStyle | the requested type of resolve, not null |
Returns
- the resolved date, null if insufficient information to create a date
Throws
DateTimeException | if the date cannot be resolved, typically because of a conflict in the input data |
---|
public String toString ()
Outputs this chronology as a String
, using the chronology ID.
Returns
- a string representation of this chronology, not null