[[["易于理解","easyToUnderstand","thumb-up"],["解决了我的问题","solvedMyProblem","thumb-up"],["其他","otherUp","thumb-up"]],[["没有我需要的信息","missingTheInformationINeed","thumb-down"],["太复杂/步骤太多","tooComplicatedTooManySteps","thumb-down"],["内容需要更新","outOfDate","thumb-down"],["翻译问题","translationIssue","thumb-down"],["示例/代码问题","samplesCodeIssue","thumb-down"],["其他","otherDown","thumb-down"]],["最后更新时间 (UTC):2024-08-09。"],[],["The content describes the assignment problem, a combinatorial optimization challenge where workers are assigned to tasks to minimize total cost. Each worker is assigned to at most one task, and each task is done by at most one worker. The example shows how the problem can be represented graphically, with edges representing possible assignments and their costs. The total cost is calculated by adding up the costs of the assigned edges. OR-Tools offer multiple tools to solve such problems, among which the MIP and CP-SAT are the most general.\n"]]