The Cost estimator tab in the Google Cloud console calculates estimated 30-day billable costs for Google Workspace APIs and Model Context Protocol (MCP) servers under the Scaled Tier. Calculations use historical 30-day project usage data, REST API daily no-charge allowances, Scaled Tier MCP pay-from-first- request pricing (0 daily no-charge allowance), and independent pricing and volume discounts for REST APIs and MCP servers across one or more Google Cloud projects linked to a billing entity.
Billing costs are estimated for the Gmail API, Google Calendar API, and Google Drive API, as well as the corresponding MCP servers for Gmail, Google Calendar, and Google Drive. Note that pricing for other MCP server products isn't supported yet.
On the Standard Tier, enabling and using generally available (GA) Google Workspace MCP servers requires no Google Cloud Billing account and is capped at 5,000 requests per day, per project, per product at no cost. Switching a Google Cloud project to the Scaled Tier removes free MCP allowances, so Scaled Tier Gmail, Calendar, and Drive MCP usage is priced from the first request (with billing enforcement starting April 1, 2027).
When you open the Cost estimator tab, it automatically preloads the 30-day daily usage records for your current Cloud project (identical to the CSV data copied from the Project billing usage tab) and displays:
- The 30-day estimated total for n project(s) card (broken down separately for API (Scaled Tier) and MCP (Gmail, Drive, Calendar)) and your cost savings (including gross unsubsidized cost and volume discounts).
- A Project usage and request volume summary table showing
(API)and(MCP)rows across each billing tier bucket and total 30-day counts by project ID.
You can also add 30-day CSV usage records from other Cloud projects to estimate combined monthly costs across multiple projects that share a Google Cloud Billing account.
View estimated costs for your current project
To review estimated 30-day costs and savings for your current Cloud project, complete these steps:
In the Google Cloud console, click Menu > the View all products tile > Google Workspace > Cost estimator.
In the upper-right corner, review the 30-day estimated total for n project(s) card, which shows your combined estimated cost along with separate lines for API (Scaled Tier) (after REST API daily no-charge allowances and volume discounts) and MCP (Gmail, Drive, Calendar) (priced from the first request with no daily no-charge allowance, after MCP volume discounts).
To view the per-track cost breakdown before discounts, click Costs by volume on the 30-day estimated total for n project(s) card. This expands the card to show separate API and MCP values for:
- Gross unsubsidized cost: The cost of billable requests or MCP billing units before applying volume discounts.
- Volume discount: The savings applied on each track according to the marginal volume discount brackets.
In the Project usage and request volume summary table, review the 30-day counts for your Cloud project across each billing tier bucket:
- Project ID: Separate
<project_id> (API)and<project_id> (MCP)rows for each Cloud project included in the estimate. - Light: Volume in the lowest-cost tier (
$0.10/1K). - Medium: Volume in the medium-cost tier (
$0.20/1K). - Plus: Volume in the higher-cost tier (
$0.25/1K). - Premium: Volume in the highest-cost tier (
$0.50/1K). - Total 30-day requests: The combined 30-day request volume (for API rows) or billing units (for MCP rows).
The summary table displays volume across the four billing tier buckets and shows
0for unused buckets. Unlike single API calls, some MCP tools count as multiple requests (billing units) because they make multiple API calls. For details and unit prices, see Billing tier buckets and unit pricing.- Project ID: Separate
The dashboard and exported data reflect actual project usage within the 30-day date range. Your actual billing cycle might be different.
Estimate combined costs across multiple projects
If your organization operates multiple Cloud projects linked to the same Google Cloud Billing account, combining their usage entries in the Cost estimator produces a more accurate projection of your monthly costs.
Combining projects is important because Google Cloud Billing pools daily REST API usage across all Scaled Tier projects on a billing account against each bucket's single daily no-charge allowance, and evaluates programmatic volume discounts on cumulative monthly spend across separate tracks for REST APIs and MCP servers. Estimating projects in isolation can underestimate REST API overages (by applying a full daily allowance to each project) or overestimate post-discount spend (when standalone volumes don't reach higher marginal discount brackets up to 40%).
You can add Cloud projects directly using the project picker (if you have permission to view their usage) or by pasting exported CSV usage data:
In the Project usage entries section of the Cost estimator tab, add usage data for each additional Cloud project:
- Select projects directly: Click Add project, select one or more Cloud projects in the project picker, and confirm. For accessible projects, the estimator loads their 30-day CSV usage data and updates the estimate automatically.
- Paste copied CSV data: Open the other project's Project billing
usage tab and click
Copy CSV (or obtain
the CSV from a teammate). Select a chip next to Projects:, then
paste the CSV into the Project usage data field to replace that
chip's entry and update Project ID from the
# project_idheader. To include both projects, select your active Cloud project's chip, paste the CSV into Project usage data, then click Add project and re-select your active Cloud project.
Repeat the preceding step for any additional Cloud projects. You can view or edit an added project's CSV data at any time by clicking its project ID chip next to Projects:.
Click Estimate cost.
The estimator recalculates the 30-day estimated total for n project(s), the Costs by volume fields, and the Project usage and request volume summary table (including the Total across projects row).
If the pasted CSV records across multiple Cloud projects span different
date ranges, the estimator identifies the latest record date across all included
projects and calculates costs for the 30-day window ending on that date (latest
date - 29 to latest date). Records outside that 30-day date range aren't
included in the calculation.
Remove a project from the cost estimate
To remove a Cloud project entry from your multi-project calculation:
- In the Project usage entries section, locate the project chip next to Projects:.
- On the chip for the Cloud project that you want to remove, click Remove .
- Click Estimate cost to recalculate the 30-day estimated total for n project(s) and the Project usage and request volume summary table.
Upgrade a project from the Cost estimator tab
When you're ready to enroll a Cloud project in the Scaled Tier, click
Upgrade to the Scaled Tier next
to its <project_id> (API) row in the Project usage and request volume
summary table.
The link opens the Dashboard tab for the selected Cloud project, where you can complete the Scaled Tier opt-in flow.