AI-generated Key Takeaways
-
LineItemFlightDateError is an enumeration that lists errors associated with LineItem start and end dates.
-
This error can occur in various Google Ad Manager services, including ForecastService, LineItemService, LineItemTemplateService, OrderService, ProposalLineItemService, and PublisherQueryLanguageService.
-
It inherits from ApiError and has one field, 'reason', which provides the specific cause of the error, such as start or end dates being in the past or an invalid date range.
-
Possible reasons for this error include START_DATE_TIME_IS_IN_PAST, END_DATE_TIME_IS_IN_PAST, END_DATE_TIME_NOT_AFTER_START_TIME, and END_DATE_TIME_TOO_LATE.
Lists all errors associated with LineItem start and end dates.
- Namespace
-
https://www.google.com/apis/ads/publisher/v202411
Field |
|
---|---|
ApiError (inherited)
|
|
|
The OGNL field path to identify cause of error. |
|
A parsed copy of the field path. For example, the field path "operations[1].operand" corresponds to this list: {FieldPathElement(field = "operations", index = 1), FieldPathElement(field = "operand", index = null)}. |
|
The data that caused the error. |
|
A simple string representation of the error and reason. |
LineItemFlightDateError
|
|
|
The error reason represented by an enum. Enumerations
|