enum DateRangeError.Reason (v201705)

The reasons for the date range error.


Namespace
https://adwords.google.com/api/adwords/cm/v201705
Enumeration Description
DATE_RANGE_ERROR
INVALID_DATE Invalid date.
START_DATE_AFTER_END_DATE The start date was after the end date.
CANNOT_SET_DATE_TO_PAST Cannot set date to past time
AFTER_MAXIMUM_ALLOWABLE_DATE A date was used that is past the system "last" date.
CANNOT_MODIFY_START_DATE_IF_ALREADY_STARTED Trying to change start date on a campaign that has started.

Send feedback about...

AdWords API
AdWords API
Need help? Visit our support page.